← The Everett Wire
Infrastructure

I-5 Off-Ramp Closure for Maintenance

πŸ”Š Listen Β· narrated by Aiden

The northbound Interstate 5 off-ramp to northbound Southcenter Parkway will close nightly from 9 p.m. to 5 a.m. beginning Monday, Aug. 10, through Friday, Aug. 14, for maintenance work. The off-ramp to southbound Southcenter Parkway will remain open during this period, according to WSDOT.

The closure affects drivers traveling from I-5 to Southcenter Parkway, with detour signage to guide traffic. WSDOT notes that local access and business operations along the affected routes will remain uninterrupted during the work period.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 7 claims supported Β· 71%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    The northbound Interstate 5 off-ramp to northbound Southcenter Parkway will close nightly from 9 p.m. to 5 a.m.β€œNightly from 9 p.m. to 5 a.m. the next day beginning Monday, Aug. 10 to 5 a.m. Friday, Aug. 14, the northbound Interstate 5 off-ramp to northbound Southcenter Parkway (milepost 154) will close for maintenance.”
  • βœ“
    The closure will begin Monday, Aug. 10β€œ005: Nightly from 9 p.m. to 5 a.m. the next day beginning Monday, Aug. 10 to 5 a.m. Friday, Aug. 14, the northbound Interstate 5 off-ramp to northbound Southcenter Parkway (milepost 154) will close for maintenance. The off-ramp to southbound Southcenter Parkway will remain open.”
  • ⚠
    The closure will end on Friday, Aug. 14No usable supporting receipt β€” unverified.
  • βœ“
    The off-ramp to southbound Southcenter Parkway will remain open during this periodβ€œThe off-ramp to southbound Southcenter Parkway will remain open.”
  • βœ“
    The closure affects drivers traveling from I-5 to Southcenter Parkwayβ€œ005: Nightly from 9 p.m. to 5 a.m. the next day beginning Monday, Aug. 10 to 5 a.m. Friday, Aug. 14, the northbound Interstate 5 off-ramp to northbound Southcenter Parkway (milepost 154) will close for maintenance. The off-ramp to southbound Southcenter Parkway will remain open.”
  • βœ“
    Detour signage will guide traffic during the closureβ€œSeparate signed detours will guide people around the closure.”
  • ⚠
    Local access and business operations along the affected routes will remain uninterrupted during the work periodNo usable supporting receipt β€” unverified.

The Everett Wire is free. Get Everett's news delivered every morning.