← The Everett Wire
Infrastructure

I-5 Ramps Close for Maintenance

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced a temporary closure of both directions of the HOV Interstate 5 on- and off-ramps at 41st Street/Broadway (milepost 192) on Thursday, Sept. 10, from 10 a.m. to 11:30 a.m.

Traffic can still use the mainline I-5 exit at Broadway during the closure. The closure is part of routine maintenance work, with the expected end time listed as 11:30 a.m. on Sept. 10.

Other road closures are scheduled in the area, including nightly lane closures on SR 527 and SR 522 through Sept. 11, and a southbound SR 99 closure with flaggers from Sept. 10 to 11.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts6 of 10 claims supported Β· 60%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    WSDOT announced a temporary closure of both directions of the HOV Interstate 5 on- and off-rampsβ€œ005 [1 mi from Everett]: From 10 to 11:30 a.m. Thursday, Sept. 10, both directions of the HOV Interstate 5 on- and off- ramps at 41st Street/Broadway (milepost 192) will close. Traffic can still use the mainline I-5 exit at Broadway.”
  • βœ“
    The closure is at 41st Street/Broadway (milepost 192)β€œ005 [1 mi from Everett]: From 10 to 11:30 a.m. Thursday, Sept. 10, both directions of the HOV Interstate 5 on- and off- ramps at 41st Street/Broadway (milepost 192) will close. Traffic can still use the mainline I-5 exit at Broadway.”
  • ⚠
    The closure was announced on Thursday, Sept. 10No usable supporting receipt β€” unverified.
  • ⚠
    The closure is from 10 a.m. to 11:30 a.m.No usable supporting receipt β€” unverified.
  • βœ“
    Traffic can still use the mainline I-5 exit at Broadway during the closureβ€œTraffic can still use the mainline I-5 exit at Broadway.”
  • ⚠
    The closure is part of routine maintenance workNo usable supporting receipt β€” unverified.
  • βœ“
    The expected end time is 11:30 a.m. on Sept. 10β€œExpected end: Sep 10, 2026, 11:30 AM”
  • ⚠
    Other road closures are scheduled in the areaNo usable supporting receipt β€” unverified.
  • βœ“
    Nightly lane closures are scheduled on SR 527 and SR 522 through Sept. 11β€œ527 [12 mi from Everett]: One lane of southbound SR 527 at 220th Street Southeast (milepost 3.0) will be closed nightly from 9 p.m. Tuesday, Sept. 8 to 4 a.m. Friday, Sept. 11.”
  • βœ“
    A southbound SR 99 closure with flaggers is scheduled from Sept. 10 to 11β€œ099 [7 mi from Everett]: From 9 p.m. Thursday, Sept. 10 to 5 a.m. Friday, Sept. 11 southbound State Route 99 traffic will alternate with flaggers at Russell Way/North Manor Way (milepost 51) for utilities work.”

The Everett Wire is free. Get Everett's news delivered every morning.