← The Everett Wire
Infrastructure

I-5 and SR 529 Closures for Maintenance

πŸ”Š Listen Β· narrated by Aiden

Multiple road closures and lane restrictions will begin this week for maintenance on Everett-area highways. The Washington State Department of Transportation (WSDOT) announced several closures effective from September 7-11, 2026.

I-5 will have HOV ramp closures at 41st Street/Broadway from 10 a.m. to 11:30 a.m. on September 10. SR 529 will have a left lane closure on the Snohomish River Bridge from September 9-11 during daytime hours. SR 99 will have alternating traffic at Russell Way from 9 p.m. September 10 to 5 a.m. September 11. I-405 will have multiple nightly closures for pavement repair from September 7-10, including off-ramps and right lanes.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 7 claims supported Β· 100%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    Multiple road closures and lane restrictions will begin this week for maintenance on Everett-area highwaysβ€œWSDOT highway construction and road closures within 50 miles of Everett β€” 9/7/2026:”
  • βœ“
    The Washington State Department of Transportation (WSDOT) announced several closures effective from September 7-11, 2026β€œWSDOT highway construction and road closures within 50 miles of Everett β€” 9/7/2026:”
  • βœ“
    I-5 will have HOV ramp closures at 41st Street/Broadway from 10 a.m. to 11:30 a.m. on September 10β€œ005 [1 mi from Everett]: From 10 to 11:30 a.m. Thursday, Sept. 10, both directions of the HOV Interstate 5 on- and off- ramps at 41st Street/Broadway (milepost 192) will close. Traffic can still use the mainline I-5 exit at Broadway.”
  • βœ“
    SR 529 will have a left lane closure on the Snohomish River Bridge from September 9-11 during daytime hoursβ€œDaily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • βœ“
    SR 99 will have alternating traffic at Russell Way from 9 p.m. September 10 to 5 a.m. September 11β€œ099 [7 mi from Everett]: From 9 p.m. Thursday, Sept. 10 to 5 a.m. Friday, Sept. 11 southbound State Route 99 traffic will alternate with flaggers at Russell Way/North Manor Way (milepost 51) for utilities work.”
  • βœ“
    I-405 will have multiple nightly closures for pavement repair from September 7-10β€œ405 [19 mi from Everett]: From 9 p.m. to 5 a.m. nightly Tuesday, Sept. 8, through Thursday morning, Sept. 10, the northbound I-405 off-ramps to NE 124th Street and Totem Lake Blvd. will close for pavement repair. Signed detours will guide people around the ramp closures.”
  • βœ“
    I-405 will have off-ramps and right lanes closures for pavement repair from September 7-10β€œ405 [19 mi from Everett]: From 9 p.m. to 5 a.m. nightly Tuesday, Sept. 8, through Thursday morning, Sept. 10, the northbound I-405 off-ramps to NE 124th Street and Totem Lake Blvd. will close for pavement repair. Signed detours will guide people around the ramp closures.”

The Everett Wire is free. Get Everett's news delivered every morning.