← The Everett Wire
Infrastructure

Road Closures and Lane Shifts Planned in Everett Area

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced multiple road closures and lane shifts effective September 11, 2026, for construction and utility work across Snohomish County routes. The most significant changes include nightly closures of SR 522 off-ramps to I-405 from September 8-12, and lane shifts on SR 96 from September 14-18.

Crews will alternate traffic through SR 525 intersections nightly from 9 p.m. to 7 a.m. through October 30 for pedestrian upgrades. SR 96 will have flagger-controlled traffic daily from 6 a.m. to 2 p.m. between mileposts 5 and 6 from September 14-18. Southbound SR 9 will close its right lane from 9 p.m. September 17 to 5 a.m. September 18 for utility work. SR 203 will have alternating traffic through 11 miles of roadway nightly from 7 p.m. to 6 a.m. through October 30.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts11 of 16 claims supported Β· 69%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT announced multiple road closures and lane shifts effective September 11, 2026No usable supporting receipt β€” unverified.
  • βœ“
    WSDOT announced multiple road closures and lane shifts for construction and utility work across Snohomish County routesβ€œWSDOT highway construction and road closures within 50 miles of Everett β€” 9/11/2026:”
  • ⚠
    The most significant changes include nightly closures of SR 522 off-ramps to I-405No usable supporting receipt β€” unverified.
  • βœ“
    The nightly closures of SR 522 off-ramps to I-405 will be from September 8-12β€œThe eastbound and westbound SR 522 off-ramps to northbound I-405 will be closed nightly from 11 p.m. Tuesday, Sept. 8 to 5 a.m. Friday, Sept. 11 and overnight from 11 p.m. Friday, Sept. 11 to 7 a.m. Saturday, Sept. 12.”
  • βœ“
    Lane shifts on SR 96 will be from September 14-18β€œ096 [7 mi from Everett]: Daily from 6 a.m. to 2 p.m. beginning Monday, Sept. 14 to 2 p.m. Friday, Sept. 18, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to State Route 9/Broadway (milepost 6) for utilities work.”
  • βœ“
    Crews will alternate traffic through SR 525 intersections nightly from 9 p.m. to 7 a.m.β€œNightly, from 9 p.m. until 7 a.m. Sunday nights through Friday mornings, contractor crews will alternate traffic through the intersections of State Route 525 in Mukilteo between Paine Field and the Mukilteo Ferry Terminal for pedestrian upgrades.”
  • βœ“
    The traffic alternation through SR 525 intersections will continue through October 30β€œ525 [6 mi from Everett]: Nightly, from 9 p.m. until 7 a.m. Sunday nights through Friday mornings, contractor crews will alternate traffic through the intersections of State Route 525 in Mukilteo between Paine Field and the Mukilteo Ferry Terminal for pedestrian upgrades. Pedestrians may need to use local roads to detour around the work zone. Effective: Aug 10, 2026, 1:29 PM Expected end: Oct 30, 2026, 7:00 AM”
  • βœ“
    SR 96 will have flagger-controlled traffic daily from 6 a.m. to 2 p.m.β€œ096 [7 mi from Everett]: Daily from 6 a.m. to 2 p.m. beginning Monday, Sept. 14 to 2 p.m. Friday, Sept. 18, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to State Route 9/Broadway (milepost 6) for utilities work.”
  • βœ“
    The flagger-controlled traffic on SR 96 will be between mileposts 5 and 6β€œ096 [7 mi from Everett]: Daily from 6 a.m. to 2 p.m. beginning Monday, Sept. 14 to 2 p.m. Friday, Sept. 18, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to State Route 9/Broadway (milepost 6) for utilities work.”
  • βœ“
    The flagger-controlled traffic on SR 96 will be from September 14-18β€œ096 [7 mi from Everett]: Daily from 6 a.m. to 2 p.m. beginning Monday, Sept. 14 to 2 p.m. Friday, Sept. 18, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to State Route 9/Broadway (milepost 6) for utilities work.”
  • ⚠
    Southbound SR 9 will close its right lane from 9 p.m. September 17No usable supporting receipt β€” unverified.
  • ⚠
    Southbound SR 9 will close its right lane to 5 a.m. September 18No usable supporting receipt β€” unverified.
  • ⚠
    Southbound SR 9 will close its right lane for utility workNo usable supporting receipt β€” unverified.
  • βœ“
    SR 203 will have alternating traffic through 11 miles of roadway nightlyβ€œ203 [14 mi from Everett]: From 7 p.m. to 6 a.m. Sunday nights through Friday mornings crews will alternate traffic with flaggers and pilot cars in sections between a nearly 11-mile stretch of SR 203, just south of Duvall to the Monroe city limits (mileposts 12.53 to 23.20).”
  • βœ“
    The alternating traffic through SR 203 will be from 7 p.m. to 6 a.m.β€œ203 [14 mi from Everett]: From 7 p.m. to 6 a.m. Sunday nights through Friday mornings crews will alternate traffic with flaggers and pilot cars in sections between a nearly 11-mile stretch of SR 203, just south of Duvall to the Monroe city limits (mileposts 12.53 to 23.20).”
  • βœ“
    The alternating traffic through SR 203 will continue through October 30β€œ203 [14 mi from Everett]: From 7 p.m. to 6 a.m. Sunday nights through Friday mornings crews will alternate traffic with flaggers and pilot cars in sections between a nearly 11-mile stretch of SR 203, just south of Duvall to the Monroe city limits (mileposts 12.53 to 23.20). Effective: Aug 3, 2026, 12:19 PM Expected end: Oct 30, 2026, 6:00 AM”

The Everett Wire is free. Get Everett's news delivered every morning.