← The Everett Wire
Infrastructure

SR 529 Bridge Maintenance to Begin Sept. 9

🔊 Listen · narrated by Aiden

The Washington State Department of Transportation (WSDOT) will close the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) for maintenance from 9 a.m. to 2:30 p.m. daily beginning Wednesday, Sept. 9, through Friday, Sept. 11.

The closure affects a 3-mile stretch from Everett. WSDOT notes the work will occur during weekday morning hours, with the bridge expected to reopen by 2:30 p.m. each day. Drivers should expect delays during the specified times.

WSDOT’s website lists the project as ongoing, with no additional details on the nature of the maintenance provided.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 10 claims supported · 30%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document ↗

  • ✓
    The Washington State Department of Transportation (WSDOT) will close the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) for maintenance“529 [3 mi from Everett]: Daily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • ⚠
    The closure will occur from 9 a.m. to 2:30 p.m. dailyNo usable supporting receipt — unverified.
  • ✓
    The closure begins on Wednesday, Sept. 9“529 [3 mi from Everett]: Daily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • ⚠
    The closure ends on Friday, Sept. 11No usable supporting receipt — unverified.
  • ⚠
    The closure affects a 3-mile stretch from EverettNo usable supporting receipt — unverified.
  • ⚠
    The work will occur during weekday morning hoursNo usable supporting receipt — unverified.
  • ⚠
    The bridge is expected to reopen by 2:30 p.m. each dayNo usable supporting receipt — unverified.
  • ✓
    Drivers should expect delays during the specified times“Daily from 9 a.m. to 2:30 p.m. (excluding Friday, Saturday, Sunday) beginning Monday, July 13 until 2:30 p.m. Thursday, Sept. 17, State Route 525 traffic will alternate with flaggers near Admiral Drive (milepost 29) for utilities work.”
  • ⚠
    WSDOT’s website lists the project as ongoingNo usable supporting receipt — unverified.
  • ⚠
    No additional details on the nature of the maintenance are providedNo usable supporting receipt — unverified.

The Everett Wire is free. Get Everett's news delivered every morning.