← The Everett Wire
Infrastructure

SR 529 Bridge Maintenance Closes Lane

πŸ”Š Listen Β· narrated by Aiden

State Route 529's southbound Snohomish River Bridge will close its left lane daily from 9 a.m. to 2:30 p.m. starting Wednesday, Sept. 9, through Friday, Sept. 11. The closure affects milepost 3 near Everett, per WSDOT records.

WSDOT states the maintenance work is scheduled for the bridge's southbound side. Drivers should expect delays during the specified hours. The closure ends Friday at 2:30 p.m., with no extension noted in the public record.

The agency's schedule shows no additional closures overlapping this work period. WSDOT advises drivers to allow extra time for travel during the affected hours.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 11 claims supported Β· 36%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    State Route 529's southbound Snohomish River Bridge will close its left lane dailyβ€œ529 [3 mi from Everett]: Daily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • βœ“
    The closure starts on Wednesday, Sept. 9β€œ529 [3 mi from Everett]: Daily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • ⚠
    The closure ends on Friday, Sept. 11No usable supporting receipt β€” unverified.
  • βœ“
    The closure affects milepost 3 near Everettβ€œ529 [3 mi from Everett]: Daily from 9 a.m. to 2:30 p.m. beginning Wednesday, Sept. 9 to 2:30 p.m. Friday, Sept. 11, the left lane of the southbound State Route 529 Snohomish River Bridge (milepost 3) will close for maintenance.”
  • ⚠
    The closure is per WSDOT recordsNo usable supporting receipt β€” unverified.
  • ⚠
    The maintenance work is scheduled for the bridge's southbound sideNo usable supporting receipt β€” unverified.
  • ⚠
    Drivers should expect delays during the specified hoursNo usable supporting receipt β€” unverified.
  • βœ“
    The closure ends Friday at 2:30 p.m.β€œEffective: Sep 4, 2026, 11:49 AM Expected end: Sep 11, 2026, 2:30 PM”
  • ⚠
    There is no extension noted in the public recordNo usable supporting receipt β€” unverified.
  • ⚠
    The agency's schedule shows no additional closures overlapping this work periodNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT advises drivers to allow extra time for travel during the affected hoursNo usable supporting receipt β€” unverified.

The Everett Wire is free. Get Everett's news delivered every morning.