← The Everett Wire
Infrastructure

US 12 Bridge Repairs, I-405 Closures Begin

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced new construction and closures affecting Everett-area highways starting Monday, August 17.

US 12 bridge repairs will close one lane over I-5 (milepost 66. 5) nightly from 7:30 p.m. Monday to 6 a.m. Thursday, August 20. Drivers will follow a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12. I-405 will close the left express toll lane northbound between Northeast 160th Street and SR 527 from 8:30 p.m. Monday to 5 a.m. Friday, August 21.

Southbound I-5 will close up to two lanes nightly from 7 p.m. Sunday to 5 a.m. Tuesday, August 18, between Barnes Drive and Exit 49/SR 504. Southbound I-405 will close up to three lanes nightly from 10:30 p.m. Monday to 5:30 a.m. Wednesday, August 19, from Coal Creek Parkway Southeast to milepost 7.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts12 of 13 claims supported Β· 92%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT announced new construction and closures affecting Everett-area highways starting Monday, August 17No usable supporting receipt β€” unverified.
  • βœ“
    US 12 bridge repairs will close one lane over I-5 (milepost 66.5) nightlyβ€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    The closure of the US 12 bridge lane will be from 7:30 p.m. Monday to 6 a.m. Thursday, August 20β€œFrom 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    Drivers will follow a signed detour using northbound I-5 to Exit 71 for SR 508β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • βœ“
    Drivers will follow a signed detour then southbound back to US 12β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • βœ“
    I-405 will close the left express toll lane northbound between Northeast 160th Street and SR 527β€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.”
  • βœ“
    The closure of the I-405 left express toll lane will be from 8:30 p.m. Monday to 5 a.m. Friday, August 21β€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.”
  • βœ“
    Southbound I-5 will close up to two lanes nightlyβ€œ005: From 7 p.m., Sunday, Aug. 16 to 5 a.m., Tuesday, Aug. 18: Up to two lanes of southbound I-5 will close nightly between Barnes Drive (milepost 52.6) and Exit 49/SR 504 (milepost 50) for paving work.”
  • βœ“
    The closure of Southbound I-5 lanes will be from 7 p.m. Sunday to 5 a.m. Tuesday, August 18β€œ005: From 7 p.m., Sunday, Aug. 16 to 5 a.m., Tuesday, Aug. 18: Up to two lanes of southbound I-5 will close nightly between Barnes Drive (milepost 52.6) and Exit 49/SR 504 (milepost 50) for paving work.”
  • βœ“
    The closure of Southbound I-5 lanes will be between Barnes Drive and Exit 49/SR 504β€œ005: From 7 p.m., Sunday, Aug. 16 to 5 a.m., Tuesday, Aug. 18: Up to two lanes of southbound I-5 will close nightly between Barnes Drive (milepost 52.6) and Exit 49/SR 504 (milepost 50) for paving work.”
  • βœ“
    Southbound I-405 will close up to three lanes nightlyβ€œ405: Up to three lanes of southbound I-405 from Coal Creek Parkway Southeast (milepost 9.5) to milepost 7 will be closed nightly, 10:30 p.m. Monday, Aug. 17 – 5:30 a.m. Wednesday, Aug. 19.”
  • βœ“
    The closure of Southbound I-405 lanes will be from 10:30 p.m. Monday to 5:30 a.m. Wednesday, August 19β€œ405: Up to three lanes of southbound I-405 from Coal Creek Parkway Southeast (milepost 9.5) to milepost 7 will be closed nightly, 10:30 p.m. Monday, Aug. 17 – 5:30 a.m. Wednesday, Aug. 19.”
  • βœ“
    The closure of Southbound I-405 lanes will be from Coal Creek Parkway Southeast to milepost 7β€œ405: Up to three lanes of southbound I-405 from Coal Creek Parkway Southeast (milepost 9.5) to milepost 7 will be closed nightly, 10:30 p.m. Monday, Aug. 17 – 5:30 a.m. Wednesday, Aug. 19.”

The Everett Wire is free. Get Everett's news delivered every morning.