← The Everett Wire
Infrastructure

US 2, I-405 closures this week

πŸ”Š Listen Β· narrated by Aiden

US 2 traffic will alternate with flaggers at Fir Road (milepost 31) nightly from 9 p.m. to 5 a.m. Tuesday, Sept. 1, through Friday, Sept. 4, for utility work, per WSDOT.

Northbound I-405 off-ramps to Northeast Fourth Street/Eighth Street and Coal Creek Parkway Southeast will close nightly from 10 p.m. Monday, Aug. 31, to 4:30 a.m. Friday, Sept. 4, with detours in place. The I-5 near Port of Tacoma Road in Fife will have overnight lane closures through Sept. 3.

WSDOT warns of delays on SR 529 southbound near Snohomish River Bridge and SR 26 east of Othello through Sept. 2.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts16 of 17 claims supported Β· 94%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    US 2 traffic will alternate with flaggers at Fir Road (milepost 31) nightlyβ€œ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • ⚠
    The traffic alternation will start from 9 p.m.No usable supporting receipt β€” unverified.
  • βœ“
    The traffic alternation will end at 5 a.m.β€œNightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • βœ“
    The traffic alternation will occur on Tuesday, Sept. 1β€œ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • βœ“
    The traffic alternation will occur through Friday, Sept. 4β€œ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • βœ“
    The traffic alternation is for utility workβ€œ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • βœ“
    The traffic alternation is per WSDOTβ€œ002: Nightly from 9 p.m. to 5 a.m. the next day beginning Tuesday, Sept. 1 to 5 a.m. Friday, Sept. 4, US 2 traffic will alternate with flaggers at Fir Road (milepost 31) for utilities work.”
  • βœ“
    Northbound I-405 off-ramps to Northeast Fourth Street/Eighth Street will close nightlyβ€œ405: The northbound I-405 off-ramp to Northeast Fourth Street / Northeast Eighth Street will be closed nightly, 10 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4. A signed detour will be in place.”
  • βœ“
    Northbound I-405 off-ramps to Coal Creek Parkway Southeast will close nightlyβ€œ405: The northbound I-405 off-ramp to Coal Creek Parkway Southeast will be closed nightly, 9 p.m. Monday, Aug. 31 – 5 a.m. Friday, Sept. 4. A signed detour will be in place.”
  • βœ“
    The off-ramp closures will start from 10 p.m. Monday, Aug. 31β€œ405: The northbound I-405 off-ramp to Northeast Fourth Street / Northeast Eighth Street will be closed nightly, 10 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4. A signed detour will be in place.”
  • βœ“
    The off-ramp closures will end at 4:30 a.m. Friday, Sept. 4β€œ405: The northbound I-405 off-ramp to Northeast Fourth Street / Northeast Eighth Street will be closed nightly, 10 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4. A signed detour will be in place. Effective: Aug 31, 2026, 12:00 AM Expected end: Sep 4, 2026, 4:30 AM”
  • βœ“
    Detours will be in place during the off-ramp closuresβ€œ405: The northbound I-405 off-ramp to Northeast Fourth Street / Northeast Eighth Street will be closed nightly, 10 p.m. Monday, Aug. 31 – 4:30 a.m. Friday, Sept. 4. A signed detour will be in place.”
  • βœ“
    The I-5 near Port of Tacoma Road in Fife will have overnight lane closuresβ€œ005: From Aug. 17-Sept. 3, expect overnight lane and ramp closures in both directions of I-5 near Port of Tacoma Road in Fife. Work is for the City of Fife <a href="https://fifewa.gov/m/newsflash/home/detail/186">Port of Tacoma Phase 2 project</a>.”
  • βœ“
    The overnight lane closures will occur through Sept. 3β€œ005: Overnight northbound I-5 lane reductions begin Sept. 1 as early as 6 p.m. near Lacey. Travelers can expect double-lane closures Tuesday through Thursday nights this week, reopening by 6 a.m. each morning between Martin Way and Mounts Road. No work scheduled over the holiday weekend. Details on the <a href="https://bit.ly/4we6ZaO">project webpage</a>.\nEffective: Aug 5, 2026, 10:00 AM\nExpected end: Sep 3, 2026, 6:00 PM”
  • βœ“
    WSDOT warns of delays on SR 529 southbound near Snohomish River Bridgeβ€œ529: On SR 529 southbound just north of Snohomish River Bridge (MP 4) the left lane is closed due to maintenance.”
  • βœ“
    WSDOT warns of delays on SR 26 east of Othelloβ€œ026: Travelers on SR 26 east of Othello will encounter slowdowns and delays from milepost 40 to milepost 41, Aug. 31 to Sept. 2, 6 a.m. to 4:30 p.m. while crews work on the road. Expect alternating, one-lane, two-way traffic, with flaggers and reduced speed limits.”
  • βœ“
    The delays will occur through Sept. 2β€œ026: Travelers on SR 26 east of Othello will encounter slowdowns and delays from milepost 40 to milepost 41, Aug. 31 to Sept. 2, 6 a.m. to 4:30 p.m. while crews work on the road. Expect alternating, one-lane, two-way traffic, with flaggers and reduced speed limits.”

The Everett Wire is free. Get Everett's news delivered every morning.